Planning & Budget
Road Intelligence

Planning & Budget

An indicative budget with its coverage: what entered the total, what did not, and why. A missing rate is never summed as zero, and the unpriced remainder is never extrapolated.

Read only
ESTIMATE ONLYNOT WORK ORDERNOT CLAIMNOT PAYMENT APPROVAL
Lines in scope
8
Lines in the total
2
Lines outside the total
6
With declared reasons
Estimated cost
NaNSAR
ESTIMATE ONLY
Partial total
2 of 8 lines entered the total; 6 stayed out — never read as the cost of the whole scope.

Reasons for exclusion from the total

QuantityNotAvailable · 3RateNotAvailable · 3

The unpriced remainder is never extrapolated from the priced lines: an average times a count is a plausible-looking number that measures nothing.

Lines

AssetTreatmentQuantityRate sourceEstimated costIn total?
RIA-2026-RYD-00000001TRT-TEST-REPLACE-FACE12.50 m2BM-v11,250.00 SARYes
RIA-2026-RYD-00000001TRT-TEST-REPLACE-FACENotEstablishedBM-v1RATE_NOT_AVAILABLEQuantityNotAvailable
RIA-2026-RYD-00000001TRT-TEST-STRAIGHTEN-POST1.00 each—RATE_NOT_AVAILABLERateNotAvailable
RIA-2026-RYD-00000001TRT-TEST-REPAINT-LINE12.50 m2BM-v1RATE_NOT_AVAILABLERateNotAvailable
RIA-2026-RYD-00000001—NotApplicable—RATE_NOT_AVAILABLEQuantityNotAvailable
RIA-2026-RYD-00000001TRT-TEST-REPLACE-FACE12.50 m2BM-v11,875.00 SARYes
RIA-2026-RYD-00000001TRT-TEST-CLEAN-SIGN1.00 eachBM-v1RATE_NOT_AVAILABLERateNotAvailable
RIA-2026-RYD-00000001TRT-TEST-REPLACE-FACENotEstablishedBM-v1RATE_NOT_AVAILABLEQuantityNotAvailable

Unknown stays Unknown — never zero, never "Good". A printed zero reads as a measurement. Codes and identifiers are never translated.

Boundary of this screen
  • No approved budget and no contractual commitment from this screen
  • No currency conversion at an invented rate — a mismatch leaves the total with its reason
  • No extrapolation of the cost of what was never priced